The Framework

  • Bid documentation
  • Design Value Engineering
  • Risk Analysis
  • EPC and Life Cycle Cost
  • Revenue Analysis
  • Financial Modelling
  • Technical Bid Tie-up
  • Operational Expense
  • Bidding Strategy
  • BOQ & most competitive cost estimate through value engineering
  • Support for bidding strategy with statistical analysis

Transplex offers pre-bid support to clients including tendering aid and assessment of client RFQ/RFP documents. Our team is experienced in studying, analyzing and suggesting technical requirements for submitting the bid documents for complex highway, bridge and infrastructure projects​.

In addition, our pre-bid advisory services include a review of all available technical reports, geotechnical surveys, technical investigations for bridges and structures, preliminary design, preparing preliminary bill of quantities, and project cost estimations with value engineering. Our domain experts have already provided pre-bid advisory services for multiple Highway and Expressway projects across India.

In the competitive market, arriving at accurate bid estimates by understanding the quantum of work is essential. We assist in increasing your chance of winning with our solid pre-bid engineering support based on our vast experience and engineering expertise.

Pre-Bid Services Executed

Name of the Project TPC(Rs In Crs) Type Authority Client
Upgradation & Strengthening of Kim-Mandvi Road 205 HAM NHAI M/s Anish Infracon, Meshana
Four-Laning of NH-716 from Kadapa Chinna Orampadu Pkg-1 1260 HAM NHAI M/s KNR Construction Hyderabad
6-lane Greenfield Varanasi-Ranchi-Kolkata Highway Pkg-8 1200 HAM NHAI M/s Anish Infracon, Meshana
4 to 8 laning of Chandikhole – Paradip Section Pkg-1 752 HAM NHAI RKD Construction, Bhubaneswar
4 to 8 laning of Chandikhole – Paradip Section Pkg-2 751 HAM NHAI RKD Construction, Bhubaneswar
Construction of four laning of Bakarpur-Manikpur road section 871 HAM NHAI RKD Construction, Bhubaneswar
2 lane from 106/830 to 158/496 of Yellareddy-Rudrur Section of NH-765D 402 EPC MORTH Swastik Infra Logistic Private Limited, Mumbai
2 lane from Km 62/920 to Km 106/830 of Medak - Yellareddy Section of NH- 765D 307 EPC MORTH Swastik Infra Logistic Private Limited, Mumbai
4-lane Pathalgaon-Kunkuri-CG/JH (Package-2) 1235 HAM NHAI RKD Construction, Bhubaneswar
4-lane Pathalgaon-Kunkuri-CG/JH (Package-1) 1152 HAM NHAI RKD Construction, Bhubaneswar
6 lane access controlled Expressway Diodarda to Udalpur of Tharad Ahmedabad Expressway Pkg 3 1745 HAM NHAI M/s DRA Infracon Pvt Ltd, Ahmedabad
Western Bhopal Bypass as 4-lane from Jabalpur-Bhopal Road and Bhopal Dewas Road 1323 HAM NHAI GHV(India) Private Limited , Mumbai
Six laning of Walajapet Ranipet to Tamil Nadu Andhra Pradesh Border 980 HAM NHAI M/s DP Jain Private Limited Nagpur
Construction of SalempurBypass to four lane with paved shoulder, UP 478 HAM MoRTH Vijay Construction-Luckhnow
Construction of 4/6 lane Southern Ayodhya Bypass PKG 2, UP 1425 HAM NHAI IJM-Hyderabad
Construction of PujaripalliBridge over River Mahanandi, Odisha 269 EPC Govt.OfOdisha Royal Infraconstru-Kolkata
Development of 6 lane Indore Bypass PKG 1, Madhya Pradesh 1048 HAM NHAI Bharat Vanijya
Development of Indore Bypass PKG2, Madhya Pradesh 943 HAM NHAI Bharat Vanijya
Widening to 4 lane of Jaunpur-AkbarPurof NH 135A, UP 792 HAM MORTH Vijay Construction-Lucknow
Widening to 4 lane with paved shoulder in Belgaon-Hungnud(NH748A) PKG3, Karnataka 977 HAM NHAI GR Infra
Widening to 4 lane with paved shoulder in Belgaon-Hungnud(NH748A) PKG4, Karnataka 948 HAM NHAI GR Infra
Six laningof existing 4 lane of NH-44, Patna Buxar, Bihar & UP 643 HAM NHAI Royal Infraconstru-Kolkata
Construction of 2 lanningof propose frontier highway PKG 6,Tutting to Zidostretch, Arunachal Pradesh 217.02 EPC NHIDCL Royal Infraconstru-Kolkata
Maintenance NH-57, Odisha 62 EPC MoRTH Mackintosh Burn -Kolkata
Maintenance NH-26, Odisha 53 EPC MORTH Mackintosh Burn -Kolkata
Widening and strengthening of existing 2 lane with PS of NH353 at KhariarRoad, Odisha 43.20 EPC MORTH Mackintosh Burn -Kolkata
Construction of bypass road to RayagadaTown and J K PurTown, Odisha 153.05 EPC MORTH Mackintosh Burn -Kolkata
Jeypore-Malkangiri New Railway Line project: Construction of New BG Railway Line Between Jeypore(0.85 Km From CSB) to 41.5 Km EPC Basis in WaltairDivision of East Coast Railway. 641 EPC East coast Railway Royal Infraconstru-Kolkata
Construction of road from km 35.58 to km 81.40(Package-2) of Kharsang-Miao- Vijaynagarsection of NH-913 (Frontier Highway) to Intermediate Lane 753 EPC MoRTH Royal Infraconstru-Kolkata
Gaya Detour Project -Construction of double line track (3rd & 4th line) of Gaya detour section (in between DFCC CH: 183.680 (IR CH:434.426) (Near KodermaDetour End) to DFCC CH:225.300 (Near New Kastha) in DHN and DDU Division of East Central Railway. 1012 EPC East coast Railway Royal Infraconstru-Kolkata
Widening & Strengthening to 2-lane with paved shoulder from Km 25.50 to 41.00 of NH116B including bypass/realignment in Km 32.400 to 33.733 and Km 39.281 to 40.780 on EPC mode. 203 EPC MoRTH Mackintosh Burn -Kolkata
Construction of 4-lane Gauripur Bypass starting from Km 852.560 of NH-31(Dumardoha Pt-II) and Terminating at Km 862.170 (Baladmara) via khudimari Pt-II, Fulkumari, Charaldanga, Sajuakuti, Geramari Pt-III and finally meeting at Km 862.170 of NH-17(New)/NH-31(Old) in the state of Assam under EPC Mode 318 EPC MoRTH (Govt of Assam Bhartia Infra Projects Ltd.
Construction of 2-lane with Paved Shoulder Greenfield Bypass for Lalganj Ajhara, Mohanganj & Raniganj on Raebareli – Jaunpur Section (Design Km 0+000 to 53+177) of NH 31 in the state of Uttar Pradesh on Hybrid Annuity Mode 712.91 HAM NHAI Vijay Construction- Lucknow
Construction of 2nd bridge over river Bramhani at Patrapur on Cuttack-Chandbali road on Turnkey basis. 217 EPC OBCC RKDC
Construction of 2nd. Bridge over river Baitarani at Chandbali on Bhadrak-Chandbali road on Turnkey basis. 228 EPC OBCC RKDC
Construction of 2nd. Bridge over river Kharasrota on Cuttack Chandbali road on Turnkey basis 228 EPC OBCC RKDC
Construction of h.L. Bridge over river Mahanadi at Pujaripalli ghat connecting to Jarimuli under Crif on Turnkey basis. 258 EPC OBCC RKDC
Construction of 4 lane Jaunpur Bypass from km 80.210 to km 107.780 of NH 135A Pkg I (Jaunpur Akbarpur Section) in the State of Uttar Pradesh on Hybrid Annuity Mode 979.95 HAM MoRTH Vijay Construction- Lucknow
Four Laning of near Satai ghat to Chowka section NH-34 from D. Ch. 89+875 to D. Ch. 145+000 (Total Length 55.125 kms) in the State of Madhya Pradesh under HAM Mode (Package-3). 717 HAM NHAI Amar Infra Pvt. Ltd.
Construction of Jabalpur Ring Road (Pakage-5)from design Chainage km 98+950 (Near Amjhar) – km 113+925, km 0+000 - to Km 2+900 (Near Barela) Design Length 17+875 km, under NH(O) in the State of Madhya Pradesh on HAM Mode. 480.9 HAM NHAI Amar Infra Pvt. Ltd.
Four Laning of Chowka to Kaimaha near MP/UP Border section NH-34 form Design Ch. 145+000 to Design Ch. 197+266 excluding existing Chhatarpur bypass from Design Ch. 160+307 to Design Ch. 168+630 (Length - 8.323 km) [Total Length – 43.924 km] (Pkg-IV) 688.67 HAM NHAI Amar Infra Pvt. Ltd.
Four laning of Vidisha Gyaraspur section of NH-146 from Design Chainage km 59+475 (existing chainage km 81+240 ) to Design Chainage km 88+361 (existing chainage km 110+315) in the state of Madhya Pradesh on Hybrid Annuity Mode (Project Length – 28.886 km) 416 HAM NHAI Amar Infra Pvt. Ltd.
Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.800 in the State of Madhya Pradesh in EPC Mode under NH(O) Scheme. 646 EPC NHAI Amar Infra Pvt. Ltd.
Construction of 4 laning of Patna-Arrah-sasaram corridor Package 2 Section 1 :- Garhani at Ch. Km 73+700 Patar at Ch. Km 84+300 & Section 2 :- Greenfield from Sadisopur at Patna Ring Road ( NH-131G) Ch. Km 0+000 to Asani (at NH-319) at Ch Km 35+800, of total length 46+400 km at NH-119A in the State of Bihar on HAM Mode 1397.84 HAM NHAI GHV (India) Pvt. Ltd.
Development of 4 lane Economic Corridor from Chandrakona - Ghatal Road Crossing to Bowaichandi section Km 41+000to Km 89+814 of NH 116A (Package-2) in the state of West Bengal under HAM Mode 1503 HAM NHAI GHV (India) Pvt. Ltd.
Construction of Imp Bridge 286 over Manair river at Ch.113034.20m with clear span 73x30.50m Composite Welded Girder with superstructure for Single track, substructure foundation for Two Tracks, approach earthwork, minor bridge, track works b/w Ch 111500.00m (Km. 111.500) and Ch 114400.00m (Km. 114.400) b/w Pro. Sircilla (Excl.) & Pro. Vemulawada (Excl.) Stations in Manoharabad - Kothapalli New BG Line in Telangana 331.5 EPC South Central Railway, Secunderabad Royal Infraconstru - Kolkata
Expansion of 4-Lane Patna-Ara-Buxar as spur connectivity from Bharauli (NH-922) to Haidaria (Purvanchal Expressway) including Construction of additional 3-Lane Bridge over River Ganga at Buxar on NH-922 in the State of Uttar Pradesh and Bihar on Hybrid Annuity Mode 625 HAM NHAI GHV- Mumbai
[Improvement and up-gradation to two lane with Paved Shoulder configuration from existing km.7+410 to km. 56+245(design chainage km 0+000 to km.49+235) Hadia Chauraha to Karmaini Ghat section of NH-328 in the State of Uttar Pradesh.] 355 EPC MoRTH MCC
[Widening and Strengthening from Km 0.000 to Km 38.853 of NH-330D (Sitapur to Kurain Section) to two lane with paved shoulder configuration in the state of Uttar Pradesh] 346 EPC MoRTH MCC
Laning of Silchar (near Budha Nagar) at Existing Km 233+000 (D. Ch. 24+560) to Jiribam at Existing km 212+060 (D. Ch. 37+650) of NH-37 (Length: 13.09 km) in the State of Assam and Manipur under NH(O)-NE on Hybrid Annuity Mode (HAM) (Pkg-2). 733 HAM NHIDCL BIPL- GUWAHATI
Development of Ujjain Jaora Access Controlled Greenfield Highway including Ujjain spur connectivity as 4 Lane with Paved Shoulder (Design length 98.41 Km) in the State of Madhya Pradesh on Hybrid Annuity Mode. 2029 HAM MPRDC Bharat Vanijya - KOLKATA
RFP for EPC contract Agreement for Doubling of Track between Lumding (km 191.522) (Including) to Dhansiri stations (km 241.00) (Excluding) (Total Length-49.478Kms) including Electrification & Signalling works in connection with Lumding -Tinsukia Jn - Dibrugarh doubling project of Northeast Frontier Railway in the state of Assam on Engineering 651 EPC NF Railway BIPL
RFP for Engineering, Procurement and Construction (EPC) contract Agreement for Doubling of Track between Dhansiri (Including) (km 241.000) to Naojan stations (Excluding) (km 285.860) (excluding Dimapur yard from km 259.062 to km 260.782=1.72 Km) (Total Length- 43.140 Kms) including Electrification & Signaling works in connection with Lumding -Tinsukia Jn - Dibrugarh doubling project of Northeast Frontier Railway in the state of Assam 651 EPC NF Railway BIPL
Doubling of Railway Project Comprising the Section Commencing From Boridand Station (west End Km:925.625) to (chirimiri Line Km : 929.990 ) and Boridand Station (west End-km:925.625 ) to Baikunthpur Road Station (west End Km: 967.055) Except Forest Area Km: 941.800 to Km:942.800 & Km :955.700 to Km : 956.700 (km: 39.430 Km for Brnd-brh Line and 4.365 Km for Brnd-chrm Line) Beside Existing Single Bg Line in the State of Chhattisgarh in the South East Central Railway Zone. at Chhattisgarh, India 606 EPC Eastern Railway C S Construction
Construction of Four Lane with paved shoulder of Bhagalpur Kharhara Village (Dhaka More) from Km 0.000 to KM 36.600 (Total length 36.600 Km) of NH-133E in the State of Bihar on EPC mode 764 EPC MORTH Vijay Construction
RFP for Engineering, Procurement and Construction (EPC) contract Agreement for "Earthwork in formation and in cutting, Blanketing, Construction of RCC Box, RCC & PCC drain, Retaining Wall, Toe Wall, Minor Bridges, 1 No. Major Bridge, 1 No ROB, Signalling & Telecom works in connection with construction of Third Line between Kamakhya to Guwahati” 292 EPC NFR BIPL
Construction/Upgradation of Existing Road to Two Lane with Paved Shoulder for the Stretch of Tikamgarh – Badagaon - Ghuwara - Shahgarh from Km 75+000 to Km 155+700 (NH-539) in the State of Madhya Pradesh on Hybrid Annuity Mode 773 HAM MORTH ABCI Infrastructure
Development of access controlled greenfield 4 lane (expandable to 6 lane) Chitrakoot Link Expressway from design chainage 0+000 to 015+172 in the state of Uttar Pradesh on Engineering, Procurement & Construction (EPC) Mode 514 EPC UPEID Vijay Construction
Construction of road from km 0.00 to km 27.430 (Package-1) of Bile-Migging section (Km 0.00 at Bile) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh. 445.84 EPC MORTH Royal Infraconstru Ltd
Construction of road from km 17.812 to km 55.377 (Package- 2) of Bile- Migging section (km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh. 512.78 EPC MORTH Royal Infraconstru Ltd.
Construction of 4 laning of Sahebganj Areraj Bettiah of NH-139W (Total length 78.942 km) in the State of Bihar on Hybrid Annuity Mode. (i) Section 1: Sahebganj to Areraj (38.362 km) and (ii) Section 2: Areraj to Bettiah (40.580 km) 1981.72 HAM NHAI Montecarlo Limited
Engineering, Procurement and Construction (EPC) Agreement for construction of New Broad-Gauge line including Electrical, Signal & Telecommunication works between Jumlapur Road(Excl.)(CH:75400) and Gurgunta(Incl.)(CH:134950)(59.55Km) under GadagWadi New BG line Project(257.26Km) 964.51 EPC South Western railway C S Construction
Execution of Civil, P-Way, Electrification, Signal and Telecom Works for Construction of New Rail Line between Godda Station (Excl.) and Mahagama station (Incld.) from Km32.439 to Km 60.00 in connection with Pirpainti Jasidih New Rail Project of Eastern Railway 531.22 EPC Eastern Railway C S Construction
Widening and strengthening of Sultanganj-Tarapur-Belhar- Katoria-Chandan-Dardmara Border (SH-22) for Two Lane with paved shoulder (10M) Width) from Km 40.00 to 98.865 Km Under Road Division, Banka for the year 2024-25 Under Pragati Yatra. 298.81 EPC BSRDC Rajbir Groups
Widening and strengthening of Bhagalpur- Amarpur - Banka (SH-25 Road) for 2 Lane with paved shoulder (10.00 M Width) for Km 0.00 to 44.300 Km Under Road Division, Bhagalpur & Banka for the year 2024 25 Under Pragati Yatra. 199 EPC BSRDC Rajbir Groups

Lets get in touch!